| Share
 

Elephant Butte Dam

Elephant Butte Dam, main unit of the Rio Grande project of the U.S. Bureau of Reclamation on the Rio Grande, SW N.Mex.; completed 1916. The dam, with its large reservoir, is used for flood control, hydroelectric power, and irrigation. The project was involved in a water-rights dispute between the United States and Mexico that was settled by a treaty in 1906.

The Columbia Electronic Encyclopedia, 6th ed. Copyright © 2012, Columbia University Press. All rights reserved.

More on Elephant Butte Dam from Infoplease:

See more Encyclopedia articles on: U.S. Physical Geography


Premium Partner Content
HighBeam Research
Documents Images and Maps Reference
(from Newspapers, Magazines, Journals, Newswires, Transcripts and Books)

Research our extensive archive of more than 80 million articles from 6,500 publications.

Additional search results provided by HighBeam Research, LLC. © Copyright 2005. All rights reserved.

24 X 7

Private Tutor

Click Here for Details
24 x 7 Tutor Availability
Unlimited Online Tutoring
1-on-1 Tutoring