| Share
 

Elephant Butte Dam

Elephant Butte Dam, main unit of the Rio Grande project of the U.S. Bureau of Reclamation on the Rio Grande, SW N.Mex.; completed 1916. The dam, with its large reservoir, is used for flood control, hydroelectric power, and irrigation. The project was involved in a water-rights dispute between the United States and Mexico that was settled by a treaty in 1906.

The Columbia Electronic Encyclopedia, 6th ed. Copyright © 2012, Columbia University Press. All rights reserved.

More on Elephant Butte Dam from Infoplease:

See more Encyclopedia articles on: U.S. Physical Geography

24 X 7

Private Tutor

Click Here for Details
24 x 7 Tutor Availability
Unlimited Online Tutoring
1-on-1 Tutoring